Category: Energy & Technology
-
Alcemi’s 2.3GWh Romania buy signals CEE storage boom
UK’s Alcemi buys 2.3GWh Romanian battery projects as Slovakia’s biggest BESS goes live – what this means for CEE grid balancing, capacity markets, and storage investors.
-
Champlain Hudson Power Express Back Online: NYC Hydro Restored
CHPE returned to service July 25 after July 1 failure. The $6B Canadian hydro line to NYC now targets up to 20% of city power. Here’s what to watch.
-
Xpeng Australia Distributor True EV Collapses: What Now?
True EV, Xpeng’s Australian distributor, enters administration after under two years. Explore the fallout for owners, the EV market, and what it signals for Chinese brands abroad.
-
BEAD Pole Attachments: How Rural Utilities Can Survive the Fiber Surge
BEAD-funded fiber builds are overwhelming rural utility pole attachment reviews. Learn the permitting risks, workforce strategies, and timeline pressures facing co-ops.
-
NextEra-Dominion Merger: World’s Largest Utility by 2027?
NextEra and Dominion filed merger applications targeting a 2027 close; the combined utility could double by 2032. Analysis of the regulatory path, data center load, and market impact.
-
Hydrogen vs SAF: Which Fuel Will Power Aviation by 2050?
NASA-backed study says SAF could meet 80% of 2050 aviation demand, but hydrogen and e-fuels face infrastructure and cost hurdles. What it means for energy investors and planners.
-
Data Center Boom Strains Grids: PG&E and CenterPoint
PG&E’s data center pipeline jumps to 12.7 GW, CenterPoint expects 14 GW in ERCOT. How utilities are filtering projects and what it means for power planning.
-
Georgia Power completes 49.5MW/198MWh Moody AFB battery
Georgia Power has completed the 49.5MW/198MWh Moody battery next to an Air Force Base, a 4-hour storage block with grid and military value.
-
MG 07: $18.6K EV With 845km Range & Lidar
MG’s 2026 fastback packs 845km range and lidar at $18,590 in China, showing how far EV cost curves have fallen and what global rivals now face.
-
RWE, Kallista build 856MWh BESS in Germany, France
RWE starts 470MWh German BESS; Kallista’s 386MWh French project uses Envision. Analysis of 2-hour duration trend, grid stability, and EU storage markets.